Project Details

24” Gas Pipeline Leak Repair at NDPHC Facilities

Patestybekon Nigeria Limited was contracted to carry out critical leak repair works on a 24-inch gas pipeline at the NDPHC (Niger Delta Power Holding Company) facilities in Calabar. The scope of work involved the assessment, isolation, and precise repair of the damaged section of the high-pressure gas line, all executed under strict HSE (Health, Safety, and Environment) compliance.

Leveraging our technical expertise, modern tools, and a seasoned engineering team, we ensured minimal downtime, safe handling of pressurized systems, and complete restoration of the pipeline to operational standards. This project reflects our competence in pipeline maintenance and our ability to deliver under tight timelines without compromising safety or quality.

Key Project Checklist – 24” Gas Line Leak Repair (NDPHC, Calabar)

Tag:

Explore Recent Projects