Project Details

Construction of 80 GPM GDU Package Foundation at MFS, OML-13:, Eket, Akwa Ibom State

This project involved the construction of foundation bases for both 60 and 80 GPM Gas Dehydration Units (GDUs) at the OML-13 location in Eket, Akwa Ibom State.

Patestybekon Nigeria Limited was tasked with delivering a solid and reliable structural foundation capable of supporting the GDU units critical to gas processing activities in the area. Working on-site in an active oilfield environment, we executed this project with strict adherence to engineering standards, HSE regulations, and industry best practices.

From initial soil testing to final concrete casting, every stage was managed by our experienced civil team — ensuring the foundation was not only structurally sound but also built to withstand the weight and vibration of gas processing operations.

The project was delivered on time and to specification, reinforcing our reputation for reliability and technical expertise in oil and gas infrastructure works.

6 Key Project Checklist – GDU Package Foundation